Close Menu
The Village Reporter
  • Home
  • Subscribe
  • Current Edition
  • Store Locations
  • Photo Albums
  • Rate Card
  • Classifieds
  • Contact Us
Facebook X (Twitter) Instagram
Sunday, March 15
Facebook X (Twitter) Instagram YouTube TikTok
Login
The Village Reporter
  • Home
  • Subscribe
  • Current Edition
  • Store Locations
  • Photo Albums
  • Rate Card
  • Classifieds
  • Contact Us
The Village Reporter
Home»News»Archbold Rotarians Updated On Projects Taking Place In Village
News

Archbold Rotarians Updated On Projects Taking Place In Village

By Newspaper StaffApril 29, 2024No Comments3 Mins Read
Share Facebook Twitter Email Copy Link
PHOTO PROVIDED / THE VILLAGE REPORTER
PROJECT UPDATES … Archbold Rotarians Dexter Krueger (left), village engineer, and Aaron Alt, assistant administrator, provided an overview of capital projects in the village that will either be completed in 2024 or started at the April 26 Rotary meeting.

Three of Archbold’s capital projects are slated to be completed this year and another three projects are expected to begin, according to Aaron Alt, the assistant village administrator.

He and village engineer Dexter Krueger discussed all of those projects at the April 26 Archbold Rotary Club meeting.

The costliest project that has been completed was a sanitary sewer project that encompassed the northwest quadrant of Archbold.

The sewer had been installed in 1959 and was showing its age with the need for frequent repairs due to tree roots and cracking – all of which are typical of an aging glazed clay tile system.


However, rather than digging up the old tile and replacing it, the village opted for a system that used the existing tile and inserted a seamless PCV like liner inside the old tile.

Krueger estimated that the new system should last at least 75 years, be resistant to cracking or allowing tree roots to penetrate the liner and cost about $8 million less to complete.

Best of all, most of the $2.1 million cost was covered by a grant and COVID money that the village had received.  Very little of the cost required local funds.


Another project that should be finished in June is the Ruihley Park splash pad. Alt explained that the features needed to finish the pad are ready to install, but sod must be laid around the pad first before it opens for the summer.

Alt added that the village administration building remodel will be finished this year. Most of the original building was finished by 1912 with some renovations over the years.

However, he noted that as walls were opened for the current remodeling a number of electrical and structural issues from earlier projects were discovered. Those had to be fixed to bring the building up to code.

Therefore, Alt said the final cost of the project will likely be about $1.7 million. This year’s projects include rebuilds of West Mechanic and Pleasant streets at an estimated cost $1.7 million.  Some of that work will be covered by a grant and the rest with local funding, according to Alt.


About $58,000 of sidewalk repairs throughout the village are planned for this year. And the final improvement is a $900,000 waterline and sidewalk project along West Barre Road.  Some of that may be covered by a grant, Alt said; however, the village hasn’t heard yet whether the grant will be approved.

Two longer range projects were mentioned: a possible roundabout for the County Road 24 and Stryker Street/Route 2 intersection and a wetlands project at the village reservoir property.

No start date has been set yet for either of those. However, Krueger said that the village should learn by early July whether grant funding that would cover most of the cost of the roundabout has been approved.

He said there are several roundabout options that would make the intersection safer, including making the intersection a four-way stop. The four-way stop would save money and make the intersection safer than it currently is, but would not as safe as a roundabout, Krueger said.


 

Previous ArticleMontpelier Moose Officers Installed For 2024-2025 Year
Next Article Celebrate National Train Day May 11 At The Museum Of Fulton County

Related Posts

With Love, Betsy Salon In Swanton Celebrates Grand Opening

March 14, 2026 News

Fulton County OSU Extension Offering Food Safety Manager Training

March 14, 2026 News

Governor DeWine Outlines Education, Safety Priorities In 2026 State Of The State Address

March 14, 2026 News

FULTON TOWNSHIP TRUSTEES Trustees: Review Cemetery Software Options, Approve Road Resolutions

March 14, 2026 News

Comments are closed.

Account
  • Login
Sponsored By
Facebook X (Twitter) Instagram
  • Opt-out preferences
  • Privacy Statement (US)
  • Disclaimer
© 2026 The Village Reporter. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?