Close Menu
The Village Reporter
  • Home
  • Subscribe
  • Current Edition
  • Store Locations
  • Photo Albums
  • Rate Card
  • Classifieds
  • Contact Us
Facebook X (Twitter) Instagram
Friday, March 13
Facebook X (Twitter) Instagram YouTube TikTok
Login
The Village Reporter
  • Home
  • Subscribe
  • Current Edition
  • Store Locations
  • Photo Albums
  • Rate Card
  • Classifieds
  • Contact Us
The Village Reporter
Home»News»Major Village Projects Continue In Swanton
News

Major Village Projects Continue In Swanton

By Newspaper StaffApril 17, 2020Updated:April 20, 2020No Comments3 Mins Read
Share Facebook Twitter Email Copy Link

WORK CONTINUES DESPITE PANDEMIC … The Project 10 Sewer Separation on Brookside Drive is one of the major projects that is currently ongoing in Swanton. (PHOTO BY BILL O’CONNELL, STAFF)


By: Bill O’Connell

Despite the enormous disruption caused by the COVID 19 pandemic, the Village of Swanton is still trying to conduct as much business as possible, including going forward with several projects that have spent years in the planning stages. The Project 10 Sewer Separation, mandated by the Environmental Protection Agency (EPA), recently began in earnest on March 13 as the residents of Brookside Drive will attest to.

Ironically, the State of Ohio’s Stay-at-Home order has minimized the amount of vehicle traffic navigating around the dump trucks, backhoes and other heavy equipment in the residential neighborhood.


At the April 13 Village Council meeting, Emergency Ordinance 2020-XX, authorizing and directing the Mayor and/or the Village Administrator to enter into an agreement with Jones & Henry Engineers for engineering services for Project 8 & 9 Sewer Separation.

Information on the Project, provided by the engineering firm, was discussed. The report read, in part, “One of the goals of Project 8 and 9 is to replace the existing sanitary/combined sewer on Mettabrook due to its shallow depth and susceptibility to freezing.  In putting the proposal together for Project 8 and 9, we reviewed existing drawings of sewers in that area to conceptualize a preliminary path for new sewers.  This allow us to make some assumptions on how the design would proceed to estimate how much time the design would take.”

“We found that the existing sewer on Mettabrook is shallow due to the shallow depth of the downstream sewers that were installed many decades ago.  In 2002, a new sanitary sewer was installed on Garfield between the interceptor and Browning Road. The new sewer was installed three feet deeper.”


“Therefore, we can lower the sewer on Mettabrook three feet, gaining the depth we need to have the sewer installed below the frost line.  The sewer work on Mettabrook, Garfield, Allen and West is required for the separation and to correct the deficiencies on Mettabrook.”

In other news, the Residential Meter Update Project, originally scheduled for late April through early May, has been postponed until further notice.

Village Administrator Rosanna Hoelzle updated the Council on the Downtown Façade Enhancement Program (DFEP).  The DFEP has a $30,000 budget and allows for businesses within the designated downtown area to apply for matching funds for improvements to the front of their building. Five applications, requesting a total of $8,060, were received, reviewed, and approved.

Ms. Hoelzle also gave an update on the Swanton residents’ response rate to the 2020 Census. She reported that Swanton had a 53% response so far with the national response at 45.1%, State of Ohio at 49.1%, Fulton County at 51.3% and Lucas County at 46.1%.


The next meeting will take place on April 27, 2020 at 7:00 p.m. by way of Zoom video conferencing and live streamed to the Village of Swanton’s Facebook page.

Bill can be reached at publisher@thevillagereporter.com


Previous ArticleMontpelier Village Council Ratifies COVID-19 Law Enforcement Memorandum Of Understanding
Next Article Pettisville Schools Decide To Cancel Prom Due To Health Pandemic

Related Posts

Marcy Kaptur Questions Trump Administration’s Decision To Release Oil From Strategic Reserve

March 13, 2026 News

Commissioners Updated On Progress Of Williams County North Annex Building Project

March 13, 2026 News

SPRINGFIELD TOWNSHIP TRUSTEES: Trustees Award Chip & Seal Bid, Address Drainage Concerns

March 13, 2026 News

Pettisville FFA Member Competes In Creed Speaking Contes

March 13, 2026 News

Comments are closed.

Account
  • Login
Sponsored By
Facebook X (Twitter) Instagram
  • Opt-out preferences
  • Privacy Statement (US)
  • Disclaimer
© 2026 The Village Reporter. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.

Manage Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
View preferences
  • {title}
  • {title}
  • {title}

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?