Close Menu
The Village Reporter
  • Home
  • Subscribe
  • Current Edition
  • Store Locations
  • Photo Albums
  • Rate Card
  • Classifieds
  • Submit News
Facebook X (Twitter) Instagram
Thursday, November 27
Facebook X (Twitter) Instagram
Login
The Village Reporter
  • Home
  • Subscribe
  • Current Edition
  • Store Locations
  • Photo Albums
  • Rate Card
  • Classifieds
  • Submit News
The Village Reporter
Home»News»Ohio Turnpike’s Wauseon Exit To Close For Construction On Monday
News

Ohio Turnpike’s Wauseon Exit To Close For Construction On Monday

By Newspaper StaffApril 13, 2024Updated:April 13, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
Share
Facebook Twitter LinkedIn Pinterest Email


(PRESS RELEASE) BEREA, Ohio – The Ohio Turnpike and Infrastructure Commission will close Toll Plaza 34 (Wauseon) for major construction work on Monday, April 15, 2024.

“The existing pavement at the toll plaza interchange will be removed and replaced with new asphalt, drainage and guardrails,” said Chris Matta, chief engineer/deputy executive director for the turnpike commission in Berea, Ohio. “All entrance and exit ramps both eastbound and westbound will be closed for about four months.”

Toll Plaza 34 is scheduled to reopen on Aug. 24, 2024, ahead of the start of the Fulton County Fair. Detour signs will be in place for motorists to observe and follow beginning April 15, 2024.

The Ohio Turnpike’s nearest detour interchanges include Toll Plaza 25 (Archbold-Fayette)/state Route 66 and Toll Plaza 39 (Delta-Lyons)/state Route 109.

“Ohio Turnpike staff have met with the Fulton County engineering department, Ohio Department of Transportation, and local emergency medical services units and fire departments to discuss the impact of the project, such as management of traffic, detour routes, emergency and safety procedures, and other concerns,” Matta added.


In addition, the Commission has installed a temporary westbound ramp for emergency personnel to access to the Ohio Turnpike during the closure of Toll Plaza 34.

“The Wauseon Fire Department has participated in several meetings with the Ohio Turnpike Commission, ODOT, and the construction companies that will be conducting the work”, said Wauseon Fire Chief Phil Kessler.

“An access ramp has been engineered and constructed for us to be able to access the turnpike for any incidents that we may be called to assist with. We should see little to no impact to any response we may have on the turnpike”, he added.


 

Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Previous ArticleRobin Chapa (1961 – 2024)
Next Article FAYETTE VILLAGE COUNCIL: Council Looking For Donations To Create Police K-9 Program
Newspaper Staff
  • Facebook

Related Posts

Driver Indentified In Williams County Hit-Skip Crash Involving Horse-Drawn Buggy

November 26, 2025

Wauseon Issues Letter Requesting Resignation From Newly Elected Council Member

November 26, 2025

Henry County Grand Jury Returns Indictments Against 15 Individuals

November 25, 2025

Swanton Students Look For Enrollment, Enlistment, Employment At Career Expo

November 25, 2025
Leave A Reply Cancel Reply

Account
  • Login
Sponsored By
Facebook X (Twitter) Instagram Pinterest
  • Home
  • Subscribe
  • Current Edition
  • Store Locations
  • Photo Albums
  • Rate Card
  • Classifieds
  • Submit News
© 2025 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?